PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing split wire aboce the ceiling for the Emergency night lighting Facing East.jpg Laying out block at the Attorneys Room Facing East.jpg Connecting copper piping to the 2nd floor VAV boxes Facing West.jpg Installed conduit inside the door frames Facing South.jpg Installed copper piping at the 4th floor Bathrooms Facing West.jpg Installing duct work raiser at the 4th floor Facing North-West.jpg Installing sprinkler branches and heads at the 4th floor Facinf East.jpg Installing sprinkler branches at the 4th floor Facing North.jpg Interior framing at the 4th floor Facing West.jpg
Previous pageNext page Installed copper piping at the 4th floor Bathrooms Facing West
Installed copper piping at the 4th floor Bathrooms Facing West